Road crossing of the village of Recoubeau-Jansac

Graphic materials & studies

Photos of existing conditions & works

Technical informations

Project owner

Commune of Recoubeau-Jansac (26)

Team

SMall Paysagiste lead contractor, STADIA for VRD and hydraulic infrastructure

Mission

Studies for all phases including ESQ/APD/PRO/DCE up to the operational phase of planting works

Landscaping component

Urban and landscape design of the departmental road 93 crossing the village: the objective is to reduce the footprint of the RD93 so that the road is no longer assimilated to a priority corridor for village life, reduction of automobile speed to 30km/h, installation of speed reducers in order to ease the crossing of the village center, PMR compliance of the sidewalks, integration of a secure pedestrian continuity in order to connect the Red Cross center to the ESAT, integration of a cycling continuity, clearing of common spaces taken from the roads for the creation of new pedestrian squares, planting of rows of trees, planted ditches and asserted plant presence, consultation work with residents

Budget

€250K for green spaces lot only

Area

1000ml en cœur de village

Date

Ongoing studies in 2024