Environmental aspect for the establishment of a landing dock on the Seine

Graphic materials & studies

Photos of existing conditions & works

Technical informations

Project owner

SARTORIUS for the RIVAL BLOC S.A.S. site in Conflans-Sainte-Honorine (78)

Team

SMall Paysagiste for landscape design, collaborating with FR Environnement and UVA 

Mission

Study phase only ESQ/APS/APD until obtaining the building permit

Landscaping component

Landscaping component for the integration of a landing quay on the Seine, planting of rural hedges, revegetation of the banks by planting of grasses and willows, pedestrian continuity along the Seine, resumption of limits and fences, creation of pedestrian and cycling continuity connected to green belt of Ile de France

Budget

€350K for Roads and Drainage (VRD) + Green Spaces excluding hydraulic works

Area

28 800m²

Date

Studies completed in 2022

Similar projects