Landscaping around the new wind turbine factory at the port of Le Havre

Graphic materials & studies

Photos of existing conditions & works

Technical informations

Project owner

Siemens Gamesa Renewable Energy for Havre Metropole and HAROPA port (76)

Team

ENIA Architects, Egis, Artelia, AMO Arcadis, SMall Paysagiste for landscape design

Mission

Project management contract for all phases landscape studies ESQ/APS/APD/PRO for the creation of a combined plant for the production of blades and assembly of wind turbine nacelles

Landscaping component

Design in landscape sequences of vegetated screens from Avenue Pierre Joannes, plant palette adapted to salt water, alignment of tall trees, shrub pockets, filtering paving stones on parking areas, three open-air patios.

Budget

€250 K excl. tax green spaces lot

Area

4,250 m² of planted areas over 69,200 m² of surface area

Date

Phase 1 completed in 2022, phase 2 in 2024-2026